Shipbuilding Development Scheme (SbDS)
Direct financial assistance to bridge the cost gap for Indian-built vessels, the world's first Ship Recycling Credit Note and the National Shipbuilding Mission that administers both. Click here to apply for this scheme and Credit Note
ExplainerWatch: Greenfield Shipbuilding Clusters explained
How India is building world-class greenfield clusters through 50:50 State-Centre SPVs, with 100% central capital assistance for common maritime infrastructure.
Watch on YouTube ↗| Readiness | Tamil Nadu | Andhra Pradesh | Gujarat | Maharashtra | Odisha |
|---|---|---|---|---|---|
| Cluster Site | Thoothukudi | Dugarajapatnam | Kucchadi | Dighi | Kendrapara |
| Land Area | 2,050 acres | 3,488 acres | 2,000 acres | 2,000 acres | 2,000 acres |
| Waterfront | 2.4 km | 2.1 km | 2.7 km | 3.0 km | 2.5 km |
| Depth / Draft | 5 m draft | 13-15 m* | 10 m within ~1 km | 14 m* | 12-15 m* |
| SPV Status | ✅ SITCOP + VoCPA | ✅ APMB + VPA | ✅ GMB + DPA | ✅ MMB + MbPA | ✅ OMB + PPA |
| TEFR Availability | ✅ | ✅ | ✅ | ✅ | ✅ |
| In-Principle Approval | ✅ Granted | ✅ Granted | ✅ Granted | ✅ Granted | ✅ Granted |
| State Policy | ✅ SB Policy | ✅ Maritime Policy 2024 | ✅ SB/SR Policy | ✅ SB/SR Policy 2025 | ✅ IPR 2022 |
| Anchor Investor | ✅ HD Hyundai | Open | Open | 5+ MoUs signed | Open |
*Depth planned post-dredging. In-principle approval has been granted for all five clusters.
Develop world-class shipbuilding clusters with shared infrastructure and advanced technologies to enhance competitiveness, drive economic growth and generate jobs - limited to one cluster per state, with preference for states offering land availability, single-window facilitation and maritime policy incentives.
Land is additionally provided at near-zero value through nominal lease rentals by the State Government.
Central Government / Entity
- 50% equity contribution
- Facilitates external trunk infrastructure (MRTH / MoR)
State Government / Entity
- 50% equity contribution · land transfer at ₹1
- Last-mile connections, urban infra, single-window clearance
- State incentives & schemes
SPV (50:50 JV)
- Owns & develops land and common maritime infrastructure
- Leases yard parcels & common infra to the anchor at nominal rental for 60+ years
- O&M including lease collection & maintenance dredging
Anchor Investor (Shipyard)
- At least 1 shipyard with ≥0.5 Mn GT annual capacity
- Pays agreed lease rental
- Invests in and operates yard-owned assets
ExplainerWatch: Brownfield Capacity Expansion explained
The scheme that lets existing Indian shipyards expand - 25% of approved project cost as capital assistance, up to ₹1,500 Cr per yard.
Watch on YouTube ↗₹2,045 Cr to be sanctioned
₹269 Cr under review
Across 7 shipyards
| # | Shipyard | Location | Investment
(₹ crore) |
Status | IEA Allocated | Scope of Project |
|---|---|---|---|---|---|---|
| 1 | Titagarh Naval Systems (TNSL) | Falta, West Bengal | 516 | IPA Granted | Yes (KOMAC) | New yard at Falta - 10-12 vessels up to 160 m/yr |
| 2 | Swan Defence & Heavy Industries (SDHI) | Pipavav, Gujarat | 504 | IPA Granted | Yes (Lloyd's) | Phase 1: Goliath crane & ELL crane |
| 3 | Mat Marine | Kakinada, Andhra Pradesh | 105 | IPA Granted | Yes (AECOM) | Shipbuilding / ship-repair infrastructure incl. slipways for +1,000 GT/yr |
| 4 | Cochin Shipyard Limited (CSL) | Vadinar, Gujarat | 920 | IPA Granted | Yes (Jacobs) | Ship repair facility at Vadinar, jointly with Deendayal Port Authority (DPA) |
| 5 | Synergy Shipbuilders / N Dock Works Ltd | Mangalore, Karnataka | 35 | Application Submitted | To be allocated | Upgradation of Mangalore facility - jetty, basin dredging, covered fabrication units |
| 6 | GRSE | Kolkata, West Bengal | 140 | Application Submitted | To be allocated | Modernisation of 6 jetties incl. RCC pile jetties, bank protection and allied utilities |
| 7 | Yeoman Marine | Ratnagiri, Maharashtra | 94.3 | Application Submitted | To be allocated | Brownfield expansion at Ratnagiri incl. channel dredging, slipway and jetty upgrades, modular fabrication, cranes and automation |
Only projects with in-principle approval granted or an application already submitted to DGMA are listed. In-principle approval carries no financial commitment - capital assistance is sanctioned only at final approval. Investment figures are as declared by applicants and remain indicative until appraisal.
Track Record & Land
- Incorporated & operational ≥3 years before 24 Sep 2025
- Land owned outright, or leased ≥15 years from application date
- Lease must be in place before In-Principle Approval
Must Hold ≥3 of 5 Core Assets
- Dry berthing (dry dock / slipway / floating dock / shiplift)
- Wet berthing (jetty / pier / wharf)
- Metal fabrication / hull erection · material handling · waterfront access
Works & JVs
- Works commence only after In-Principle Approval
- Completion within 6 years of Final Approval
- Subsidiaries/JVs eligible if applying yard holds ≥50% (or ≥33.4% in 3+ partner JV)
Any facility not listed is reviewed by the Implementing Agency (IA) and submitted to NSbM for case-by-case approval.
Eligibility, DPR & business plan
Verify eligibility (≥3 of 5 core assets); prepare DPR (Annexure I) and Business Plan; obtain environmental & statutory clearances; submit online with affidavit/indemnity bond and board resolution.
No financial commitment yet
≤₹100 Cr: DGMA grants directly. >₹100 Cr: DGMA reviews and refers to NSbM.
Technical & financial due diligence
Independent Evaluation Agency conducts a physical site visit, assesses technical feasibility, cost reasonableness, financial viability & regulatory compliance, then issues a TFAR to the Project Appraisal Committee (PAC). Shipyard demonstrates financial closure (equity + debt covering 75% of APC) and submits a security instrument.
Sanction letter issued
≤₹100 Cr: DGMA approves on PAC recommendation. >₹100 Cr: DGMA → PAC → NSbM.
15% - 30% - 35% - 20%
T1 (15%) on work-order issuance for ≥50% of approved project cost; T2 (30%) at 15% physical progress; T2 (35%) at 75% of T1 utilised; T3 (30%) at 40% physical progress & 75% of T1+T2 utilised; T4 (20%) on 100% project completion certificate & 100% of T1-T3 utilised.
ISTC is incorporated as a Section 8 company, with budget allocation sought and received for BE 2026-27 and its CEO and other functionaries being appointed. A steering committee of industry stakeholders - including CSL, IMU, IMDA and SAI - has been set up to initiate SaaS procurement, run a gap analysis of existing testing infrastructure, develop R&D support guidelines, and propose additional testing infrastructure based on that analysis.
ISTC is mandated to centrally procure design software and offer it to industry at nominal cost - extensive discussions with providers have identified software across three categories:
Operationalises the ₹1,443 Cr allocation under SbDS to provide financial protection to Indian shipyards against key risks in domestic and export shipbuilding projects, at nominal premiums.
Source: Implementation Guidelines for Credit Risk Covers under SbDS, MoPSW / DGMA.